Unfinised work still left unfinished

Posted 10 years ago, 27 Jan 2014 by Mark Hester Profile Mark Hester

Tommy Daly Chairperson of the Moyross Residents Alliance is sick of the Limerick Regeneration with their promises, hiring contractors which are doing flawed work which endangers our kids, we are sick of our kids being discriminated here in Delmege Park, we have included images of a girl who has fallen and obtained a nasty gash on the knee from the uneven pavement work, which was left by Airtricity contractors. We are also experiencing a huge flood outside our community garden, which has been accumulating the last six weeks due to high rainfall and this is because of the blocked drains which the cement has now settled inside, after the contractors completed their job, our kids have to walk around this pool of water which delays time which should not be an issue to begin with. We reported this to Micheal O' Kelly before Christmas and it was promised that this would be fixed and drains repaired as soon as it was possible, which was now 6 weeks ago, we call on them to get off their arses and sort out this problem before someone else gets hurt or in a worst case, infection from playing in the dirty water that is connected to the main drainage system of limerick. They would want to get off their backsides and get these issues sorted out immediately, this is a health hazard and our kids need to play in a safe environment, not a dirty swimming pool outside their doors, Tom Daly Chairperson of the Moyross Residents Alliance.